XL-7 2WD V6-3.6L (2007)
28. Twist together one connector wire lead to one deployment wire.
29. Bend flat the twisted connection.
30. Secure and insulate the connection using electrical tape.
31. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
32. Connect the deployment harness to the yellow connector of the roof rail module.