suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Inflator Module Handling and Scrapping|Page 14856 > < Inflator Module Handling and Scrapping|Page 14854
Page 26
background image

68. Continue the same process with the remaining deployment harnesses.
69. Stretch to the full length all of the deployment harness wires on the left side of the vehicle.
70. Deploy each deployment loop one at a time.
71. Place a power source, 12 V minimum / 2 A minimum, such as a vehicle battery, near the shorted end of the harnesses.
72. Separate one set of wires and touch the wires ends to the power source in order to deploy the selected inflator modules.
73. Disconnect the deployment harness from the power source and twist the wire ends together.
74. Continue the same process with the remaining deployment harnesses.
75. Remove the drop cloth from the vehicle.
76. Disconnect all harnesses from the vehicle.
77. Discard the harnesses.
78. Scrap the vehicle in the same manner as a non-SIR equipped vehicle.
79. If one or all of the inflator modules did not deploy, remove the undeployed.

Inflator Module Handling and Scrapping|Page 14856 > < Inflator Module Handling and Scrapping|Page 14854