suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Positive, Battery Cable|Service and Repair|Page 12999 > < Positive, Battery Cable|Service and Repair|Page 12997
Page 5
background image

8. Install the battery box. Refer to [Battery Box Replacement].
9. Install the positive battery cable terminal (2) to the UBEC stud.

10. Install the positive battery cable terminal nut (1) to the UBEC stud.

Tightening torque
Tighten the nut to 15 N.m (11 lb.ft).

Positive, Battery Cable|Service and Repair|Page 12999 > < Positive, Battery Cable|Service and Repair|Page 12997