suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Oil Cooler Line Replacement|Page 12220 > < Fluid - A/T|Capacity Specifications|Page 12215
Page 1
background image

Fluid Line/Hose: Service and Repair
Oil Cooler Line Replacement

Oil Cooler Line Replacement

Removal Procedure

WARNING: 
Ensure that the vehicle is properly supported and squarely positioned. To help avoid personal injury when a vehicle is on a hoist, provide
additional support for the vehicle on the opposite end from which the components are being removed.

1. Position the vehicle on a hoist and raise the hood.
2. Place a drain pan or suitable container under the vehicle.

3. Disconnect the upper transaxle oil cooler line from the radiator.
4. Raise the vehicle. 
5. Disconnect the lower transaxle oil cooler line.
6. Disengage the transaxle cooler lines from the fan shroud.

7. Remove the transaxle cooler line assembly nut (2) from the transaxle.
8. Remove the transaxle cooler lines (1) from the vehicle.
9. Replace the transaxle oil cooler pipe seals. 

Oil Cooler Line Replacement|Page 12220 > < Fluid - A/T|Capacity Specifications|Page 12215