XL-7 4WD V6-2.7L (2003)
17. Check each aligned timing marks as shown in the figure.
18. Install LH bank 2nd timing chain.
19. Install timing chain cover.
20. Install oil pan.
21. Install front differential housing.
22. Install P/S system.
23. Install cooling system.
24. Install intake manifold with throttle body.
25. Refill cooling system with coolant, front differential with gear oil, P/S system with specified fluid and engine with engine oil.
26. Check wheel alignment.
27. Verify that there is no fuel leakage, water leakage and oil leakage at each connection.