suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Refueling Vapor Recovery System > < Evaporative Emission Control Canister|Testing and Inspection
Page 1
background image

Evaporative Emission Control Canister: Service and Repair

REMOVAL

1. Hoist vehicle.

2. Remove EVAP canister (1) with its bracket (2).
3. Disconnect tank hose, purge hose and refuel vapor control valve hose from EVAP canister.

For quick joint, disconnect it as follows:
a. Remove mud or dust around joint by blowing compressed air, and push joint fully in arrow direction.
b. Disconnect hose joint while joint lock is unlocked by pushing both sides of joint.

4. Remove EVAP canister bolts.
5. Disconnect air valve hose from EVAP canister.

INSTALLATION

1. Connect air valve hose to EVAP canister.
2. Install EVAP canister (1) to its bracket.
3. Connect tank hose, purge hose and refuel vapor control valve hose to EVAP canister (1), and clamp then securely. For quick joint, push joint into

pipe till joint lock clicks.

Refueling Vapor Recovery System > < Evaporative Emission Control Canister|Testing and Inspection