suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Load Test|Page 2880 > < Starting and Charging|Specifications|Page 2877
Page 1
background image

Battery: Testing and Inspection
Load Test

1. Connect voltmeter (1) and battery load tester (2) across terminals of battery (3).
2. Apply proper face charge. Refer to L.T. (Load Test) described on battery caution label. For example, if it is 190, apply 190 ampere load.
3. Remove the load and wait 15 seconds to let battery recover.
4. Apply same load as in Step 2). Read voltage after 15 seconds.
5. Remove the load.

-

The voltage does not drop below the minimum as listed in table. - Battery is good.

-

The voltage does drop below the minimum as listed in table. - Replace the battery.

Battery Load Test Voltage

NOTE:
Temperature of battery will affect minimum voltage required to pass load test.
See the figure and estimate the temperature battery has been exposed to for the last several hours.

Load Test|Page 2880 > < Starting and Charging|Specifications|Page 2877