Celica L4-1.8L (2ZZ-GE) (2005)
(c) Apply seal packing to 2 locations as shown in the illustration.
Seal packing:
-
Part No.08826-00080 or equivalent
-
Install a nozzle that has been cut to a 1.5 mm (0.16-0.20 in.) opening.
HINT: Avoid applying an excessive amount to the surface.
-
Parts must be assembled within 3 minutes of application. Otherwise the material must be removed and reapplied.
-
Immediately remove nozzle from the tube and reinstall cap.
(d) Install the timing chain cover, 0-ring and water pump with the 16 bolts and 2 nuts. Uniformly tighten the bolts and nut in several passes.
Torque:
10 mm head:
9 Nm (92 kgf-cm, 80 in-lbf) for C
13 Nm (133 kgf-cm, 10 ft-lbf) for D and E
11 Nm (113 kgf-cm, 8 ft-lbf) for B
12 mm head:
18.5 Nm (189 kgf-cm, 14 ft-lbf) for A
NOTICE:
-
Pay attention not to wrap the chain and slipper over the chain cover seal line.
-
After installing the chain cover, must install the mounting bracket and water pump within 15 minutes.
HINT: Each bolt length in indicated in the illustration.
A: 45 mm (1.77 in.)
B: 35 mm (1.38 in.)
C: 22 mm (0.87 in.)
D: 25 mm (0.98 in.)