Connect auxiliary aggregates support with power steering pump to
cylinder block – tightening torque 35 Nm / 26 lbf. ft.
Connect pressure line and return line to power steering pump.
Attach ground cable (1) to auxiliary aggregates support. Belt
pulley to power steering pump – tightening torque 20 Nm / 15
lbf. ft. + 30° + 15°.
Install ribbed V-belt – see operation "Ribbed V-belt,
Remove and Install". Install battery. Charge hydraulic system
– see operation "Hydraulic System, Charge and Bleed" in group
"M".
|