vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Component Locator > < Pre-volume Chamber, Remove and Install

Illustration

1. Air intake hoses
2. Resonance pipes switchover valve housing
3. Connection hoses
4. Pre-volume chamber
5. Connecting hose
6. Hot film mass air flowmeter
7. Air intake manifold
8. Air intake manifold
9. Air intake hose
10. Air cleaner housing, lower part
11. Air cleaner housing, upper part

Object Number: 2417277  Size: DEFAULT

Note:   Any possible contamination (grease, oil, etc.) must be cleaned from hoses and connections prior to assembly.

Strict observance of a torque of 3.5 Nm / 2.6 lbf. ft. must be ensured when tightening the hose clamps.

Caution

Only if the hose clamps are correctly tightened to the specified tightening torque, can sealing of the intake system and thereby operational safety be ensured.


Related Literature Units
-
-

Component Locator > < Pre-volume Chamber, Remove and Install