Beetle L4-1.9L DSL Turbo (ALH) (1998)
^
One hole 12.5 mm diameter (arrow) drilled in the 10-222 A/21 guide
Toothed belts, removing
-
Remove tube between charge air cooler and Air intake pipe
-
Disconnect fuel supply and return lines at fuel filter.
-
Remove fuel filter from bracket.
-
Remove toothed belt guard - upper section.
-
Remove valve cover.
Note: The valve cover has an integrated, vulcanized gasket. If damaged or leaking replace the valve cover.
-
Remove brake booster vacuum pump.
-
Remove pipe between charge air cooler and turbocharger.
-
Remove insulation tray - right side
-
Remove ribbed belt.
With engine installed:
-
Turn crankshaft to cylinder 1 TDC.
With engine removed:
-
Turn crankshaft to cylinder 1 TDC.
Vehicles with manual transmission
-
Install adjustment device 2068 A as shown.
-
Set adjustment device to 96 mm (arrow -A-). Left-hand notch of vernier scale is reference point.