volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Campaign - A/T Shift Lock Cable|Page 5081 > < Campaign - A/T Shift Lock Cable
Page 2
background image

-

Install protective tube -A-, part number N 102 930 01

-

Center tube to groove and secure both ends of tube with tape.

NOTE:  After inserting cable into groove, ensure that console screws do not interface with plastic tube.

-

Reinstall center console, console cover, gear shift cover, gear shift handle and reconnect ground (-) cable to battery.

-

Reset clock and activate radio with code

-

Reset the power window pinch protection by inserting key in driver's door, and lowering then raising the door window. Quickly turn key two times
to lock position.

-

Using the VAG1551 set throttle adaptation as follows:

NOTE:  for gasoline vehicle only

-

Plug 1551 into vehicle under dash on driver's side turn ignition to "ON" position.

-

Enter 01 then push Q button

-

Enter 02 then push Q button

-

Clear any faults present

-

Push arrow button

-

Enter 04 then push Q button

-

Enter 060 then push Q button

-

Wait a minimum of 30 seconds before pressing the arrow button

-

press the arrow button to exit

-

Turn ignition switch to "OFF" position and remove VAG1551

Campaign - A/T Shift Lock Cable|Page 5081 > < Campaign - A/T Shift Lock Cable