volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Routing Tensioning Bands|Page 16044 > < Routing Tensioning Bands|Page 16042
Page 1
background image

Convertible Top Cable: Description and Operation
Routing Tensioning Bands 2 and 3

Tensioned Headliner Tensioning Bands

Routing Tensioning Bands 2 and 3

‹› To support roof, both sides of luggage compartment trim should be either removed or installed.

‹› The bypass screw on the hydraulic pump must be opened after the repair position has been reached on vehicle from May 07. This prevents

damaging the hydraulic system.

-

Raise roof using convertible top operating switch and remove (VAS 6365).

-

Close roof using convertible top operating switch until it makes contact with windshield frame.

-

Open hydraulic pump bypass valve.

-

Place (VAS 6365) in center position -  2 -.

-

Secure (VAS 6365) on rear window frame locking mechanism - 1 -.

-

Lower rear window frame until supports - 4 - are positioned on longitudinal member - 5 -.

‹› All screws are microencapsulated and must always be replaced.

‹› Bolt tightening specification 3 Nm

Routing Tensioning Bands|Page 16044 > < Routing Tensioning Bands|Page 16042