Eos (1F7) L4-2.0L Turbo (CCTA) (2009)
-
Remove the screws - arrows - (4 Nm) and guide fuse panel - 1 - out toward inside, considering length of available cable.
Installing:
Install in reverse order of removal, noting the following:
-
Tighten the screws to the tightening specification. Refer to => [ Fuse Panel Tightening Specifications ] See: Specifications/Fuse Panel Tightening
Specifications.