volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < Evaporative Check Valve|Testing and Inspection
Page 2
background image

-

Connect the contacts on the solenoid valve - 1 - to the battery using adapter lines. This opens the EVAP canister purge regulator valve 1.

Then activate the (VAS 6213) several times.

  ‹› Vacuum must build up.

-

Disconnect the battery again (interrupt the power supply).

No vacuum:

-

Replace the double check-valve - 1 -.

The double check-valve, the EVAP canister purge regulator valve 1 and the plastic hoses are one component. The intake manifold must be removed to
replace them.

Positive Crankcase Ventilation > < Evaporative Check Valve|Testing and Inspection