Eos (1F7) V6-3.2L (BUB) (2008)
Checking Ground (GND)
-
Using a multimeter, check the Positive Crankcase Ventilation (PCV) Heating Element (N79) electrical connector terminal 2 to Ground (GND) for
continuity.
If the specification was not obtained:
-
Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).
-
Check the electrical harness connector for damage, corrosion, lose or broken terminals.
-
If necessary, repair the faulty wiring connection.
If no malfunction is detected in the wiring:
-
Replace the Positive Crankcase Ventilation (PCV) Heating Element (N79). Refer to => [ Engine Control Module J623, Replacing ] See:
Computers and Control Systems/Engine Control Module/Service and Repair/Engine Control Module J623, Replacing.
Final procedures
After repair work, the following work steps must be performed in the following sequence:
1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] See: Computers and Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Diagnostic Modes 01 - 09 [ (BPY) (BUB) ]/Diagnostic Mode 03 - Read DTC Memory.
2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] See: Computers and Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Diagnostic Modes 01 - 09 [ (BPY) (BUB) ]/Diagnostic Mode 04 - Erase DTC Memory.
3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] See: Computers and Control Systems/Testing and
Inspection/Monitors, Trips, Drive Cycles and Readiness Codes.
-
End of diagnosis.