volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Procedures|Page 3705 > < Procedures|Page 3703
Page 3
background image

NOTE:  When routing water drain hoses, ensure adequate slope for drainage.

1

-

Front frame drain

2

-

Front drain hose
-

Blow thru front frame drain - 1 - with compressed air to clean

3

-

A - pillar

4

-

B - pillar

5

-

Adapter

6

-

Molded hose

7

-

Rear frame drain

8

-

Rear drain hose
-

Covered with foam tube in D pillar area

-

Water drain hose and foam tube are taped together with fabric tape in lower area - B - a = 200 mm (approx. 8 in.)

9

-

B - pillar cover

10

-

A - pillar cover

Water Deflector Plate (With Sun Shade), Removing

Water Deflector Plate (With Sun Shade), Removing

Procedures|Page 3705 > < Procedures|Page 3703