Eurovan V6-2.8L (AXK) (2001)
-
Reinstall lower trim panels
-
Reinstall instrument panel side cover
-
Reconnect battery ground (GND) cable and tighten to 6 Nm (53 in. lbs)
-
Reinstall battery cover
-
Proceed to Section A3
Section A3 - Repair verification and readiness code setting
-
If a wiring harness was modified, turn ignition switch "ON" and "OFF" before first starting engine, then:
-
Start vehicle and verify correct operation
-
Remove key and wait up to 30 seconds to ensure that the vacuum pump does not run
-
Set engine readiness code and power restoration procedure
-
If a wiring harness was not modified and the MIL light was on with cylinder misfire DTCs present, printed and erased, use VAS5051 and set
engine readiness code
-
Attach a copy of print out for diagnostic log (showing cylinder misfire DTCs) and readiness code "Test Complete" to repair order
NOTE: Readiness code setting is not related to this action when other components related to the MIL light are diagnosed and repaired
-
Destroy and properly dispose of removed ignition coils
Section A4 - Wiring Harness Assembly
NOTE: This section is needed only if the wiring harness assembly 1J0 971 658 N is not obtainable
-
Using a repair wire -2- (000 979 227), cut wire approx. 100 mm from terminal, insert wire in butt connector -A- (111 971 939 B) and crimp butt
connector with the VAS 1978/2 crimper
-
Using a repair wire -1- (000 979 220), cut wire approx. 100 mm from terminal, insert wire in butt connector -A- and crimp butt connector
-
Seal the butt connector using the electric hot air blower from the VAS 1978 repair kit
-
Insert terminal end of wire -2- into position 2 -arrow- of relay connector -12- and wire end -1- into a terminal housing -10- (191 972 761)