Eurovan V6-2.8L (AXK) (2001)
^
Checking delivery pressure
^
fill with oil before installing
8 - Bracket
9 - Bolt 20 Nm
10 - Bolt 20 Nm
11 - Seal
^
Always replace
12 - Banjo fitting 40 Nm
13 - Pressurized - line
^
With check valve
^
Watch for kink free hose routing
14 - Screw clamp 4 Nm
15 - Bolt 10 Nm
^
If bolting is performed from the top during production, bolting can take place from the bottom during repairs
16 - Clamp
^
Upper and lower part
^
Install with a distance of 55 mm from hose end (pressure hose)
17 - Return line
^
Watch for kink free hose routing
^
Route at a distance of 20 mm to subframe
^
Connection marking points upward
18 - 30 Nm
19 - Left Hand Drive (LHD) steering gear
^
Right Hand Drive (RHD) steering gear go to Fig. 5
20 - Sealing ring
^
Always replace
21 - Spring clip
22 - Cooling line
^
Long front of vehicle
23 - Hex bolt, 8 Nm
24 - Return hose
^
Watch for kink free hose routing
25 - Grommet
26 - Cooling line
^
short front of vehicle
27 - Refill tank
^
Oil level: between Min. and Max. marking
28 - Intake hose
^
Watch for kink free hose routing
^
Installation position go to Fig. 4
29 - Return hose
^
Watch for kink free hose routing
^
Connection marking points upward
30 - Hex bolt, 10 Nm
31 - Wire bracket
^
Installation position for 4- and 6- cyl. engine are different
^
Set onto color marking
32 - Bracket
^
Installation position go to Fig. 3
Vane pump, hydraulic lines and refill tank (vehicles with 5-cyl. engine), assembly overview