t
| Release connection by pulling the locking clip -arrow-. |
t
| Pull hose/pipe off without the use of tools. |
t
| When installing, ensure the locking lugs -A- engage correctly. |
t
| Checking charge air system for leaks → Chapter |
Note Charge air system must be free of leaks. |
|
|
|