Golf Mk5
Engine codes AVQ BJB, BKC, BRU, BXE and BXF |
1 - | 10 Nm |
2 - | Union nut, 22 Nm |
3 - | Oil supply line |
q | Before installing oil supply line, ensure that it is not blocked. |
q | Before installing, fill turbocharger with engine oil through oil supply line connection. |
q | Removing and installing → Chapter |
4 - | Union nut, 22 Nm |
5 - | Seal |
q | Renew. |
q | Note installation position. |
6 - | Washer |
7 - | 25 Nm |
q | Renew. |
8 - | Support |
q | Between turbocharger and cylinder block. |
9 - | 40 Nm |
q | First hand tighten all bolts |
10 - | Connecting pipe |
q | Air filter/turbocharger |
11 - | Connecting piece |
12 - | Seal |
q | Renew. |
13 - | Seal |
q | Renew. |
14 - | Union, 40 Nm |
15 - | Oil return line |
q | To cylinder block. |
q | Tighten union nut to 30 Nm. |
16 - | 17 Nm |
17 - | Vacuum hose |
q | To solenoid valve block |
18 - | Turbocharger |
q | Can only be renewed with exhaust manifold. |
q | To remove turbocharger, remove right drive shaft → Running gear, axles, steering; Rep. gr.40. |
19 - | 20 Nm |
q | First hand tighten all bolts |
20 - | 20 Nm |
q | Renew. |
21 - | Heat shield |
22 - | Seal |
q | Renew. |
q | Note installation position. |
23 - | Clamp, 7 Nm |
24 - | Front exhaust pipe |
25 - | Bracket |
q | For oil supply line → Item. |
q | Before installing, secure oil supply line. |
26 - | 22 Nm |
q | Renew. |
27 - | Connecting pipe |
q | To bypass flap |
28 - | Union, 30 Nm |
q | Renew. |
q | Coat threads and bolt head seating surface with „G 052 112 A3“. |