volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Shift Interlock Solenoid|Locations|Page 4481 > < Shift Interlock Solenoid|Locations
Page 1
background image

Shift Interlock Solenoid: Description and Operation

Shiftlock Switch

SHIFTLOCK SOLENOID N110

The electromagnet receives current from terminal 15 and earth from control unit according to the information from the Shift Interlock Switch. When
the brakes are operated the earth is interrupted and the selector lever lock released.

Shift Interlock Solenoid|Locations|Page 4481 > < Shift Interlock Solenoid|Locations