volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Boot With Shift Knob and Noise Insulation|Page 2247 > < Boot With Shift Knob and Noise Insulation|Page 2245
Page 12
background image

‹› After the cables cross each other diagonally - arrow -, they must run parallel to each other up to the cable mounting bracket on the transmission.

‹› Make sure the cable tie - arrow - for attaching the cables is installed correctly. Installation location. Refer to => [ Cable Tie Installation Locations

] See: Shift Linkage/Shift Cable/Service and Repair.

‹› The cables must be routed in the provided recesses in the heat shield -  3 -.

‹› The enlargement shows the heat shield from above.

A clip - A - holds the cables and heat shield to each other in place.

The holes in the cable retainers have various diameters.

Allocation of cable retainers. Refer to => [ Allocation of Cable Retainers ] See: Shift Linkage/Shift Cable/Service and Repair

-

Spread a small quantity of grease (G 000 450 02 ) on pin - arrows - of transmission shift lever -  1 - and of actuator lever - 2 -.

Boot With Shift Knob and Noise Insulation|Page 2247 > < Boot With Shift Knob and Noise Insulation|Page 2245