Golf GLS L4-1.8L Turbo (AWW) (2001)
-
Route overlay harness in harness duct along existing harness connector (arrow) near strut support.
-
Separate connector as shown.
-
Connect overlay harness connector.
-
Cut existing unused connector and terminate wire as described in "Unused wiring, terminating".
Overlay harness routing to ECM (all vehicles)
-
Route overlay harness along existing harness to plenum opening.
-
Continue routing overlay harness along existing wiring harness to Electronic control Module (ECM) located in the plenum. Electronic control
module (ECM), installing overlay harness
-
Remove smaller (40-pin) connector from ECM.
-
Cut cable-tie for cover, then remove cover.
-
Remove purple secondary lock for 32-pin connector block (arrow).