GTI V6-2.8L (BDF) (2002)
Tip: Slide long cable (from regulator) under single cable (already installed).
^
Attach regulator to carrier by inserting three pins from regulator into the carrier assembly (pressing gently to seat).
^
Slide cable sheathing ends into regulator (arrows).
^
Insert short cable (from regulator assembly) into carrier assembly nearest speaker hole (black arrow), leaving cable loose (as shown) DO NOT
route cable around this pulley at this time.
^
Insert long cable into carrier assembly opposite speaker hole (white arrow), routing cable around pulley (use correct tool as necessary).
Tip:
Cable ends must end up near top of regulator for insertion into A-pillar clamp (clamp nearest speaker).
A-pillar clamp is always installed first and can only be installed at top of carrier. With regulator/cable assembly installed onto carrier
With regulator/cable assembly installed onto carrier assembly:
^
Locate new clamps, remove isolators and set isolators aside for installation later in this procedure.
^
Install new clamps, see "Window clamp, installing on track."
Window clamp, installing on track
^
Install window clamp on track and insert cable crimped ends in identical position as removed (not overlapping).
Tip:
First cable is fitted into deep pocket, then insert second cable into shallow pocket.
^
Flip clamp down towards track.