volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Variable Valve Timing > < Timing Cover|Specifications|Page 1504
Page 4
background image

‹› The sealant bead must be 1.5 to 2.0 mm thick.

-

Coat the seal in the chain compartment cover lightly with engine oil and slide the chain compartment cover onto the pipe connection.

-

Install all bolts and tighten them in a diagonal sequence.

The rest of the installation follows the reverse of the removal procedures. When doing this note the following:

-

Fill the cooling system. Refer to --> [ Draining and Filling ] See: Cooling System/Service and Repair/Cooling System, Draining and Filling. 

-

Install the battery..

Tightening Specifications

Variable Valve Timing > < Timing Cover|Specifications|Page 1504