volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

CAN-Bus Terminal Resistance, Selector Lever to Motronic Engine Control Module, Checking|Page 2936 > < CAN-Bus Terminal Resistance, Selector Lever to Motronic Engine Control Module, Checking|Page 2934
Page 1
background image

Shifter A/T: Testing and Inspection
Selector Lever Voltage Supply, Checking

Selector Lever Voltage Supply, Checking

Special tools, testers and auxiliary items required

‹› multimeter.

‹› Wiring diagram.

Test requirements

‹› The Direct Shift Gearbox (DSG) Mechatronic (J743) fuses OK.

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› Selector lever in "P".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to --> [ Preliminary Check ] See: Powertrain Management/Computers and
Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Remove the selector mechanism, far enough to gain access to the Selector Lever (E313) electrical harness connector -  A -.

-

Disconnect the Selector Lever (E313) electrical harness connector - A -.

CAN-Bus Terminal Resistance, Selector Lever to Motronic Engine Control Module, Checking|Page 2936 > < CAN-Bus Terminal Resistance, Selector Lever to Motronic Engine Control Module, Checking|Page 2934