New Beetle L4-1.8L Turbo (BNU) (2005)
-
Pull locking cable out of instrument panel.
Installing
Note: Do not kink the locking cable. Adjust the locking cable after installation.
Installation position of locking cable
1 - Footwell vent
2 - Instrument panel support
3 - Heater unit
-
Move pull rod upward and shift selector lever to position "P" with pull rod still held up.
-
Pull locking cable slightly out of cable casing and hook into locking lever - arrow C -.
-
Hook locking cable support mounting into gear lever bracket - arrow B -.
-
Insert locking cable into steering column lock. Flattened side of cable faces downward.