volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 5567 > < Diagram Information and Instructions|Page 5565
Page 1
background image

Shift Solenoid: Testing and Inspection

Solenoid Valves In Valve Body, Checking

Recommended special tools and equipment

-

VA.G 1526 multimeter or V.A.G 1715 multimeter

-

V.A.G 1594 connector test kit

-

Wiring diagram

Requirements

-

Respective fuses must be OK.

-

Battery voltage must be at least 11.5 volts.

-

All electrical consumers such as, lights and rear window defroster must be switched off.

-

Parking brake must be engaged or else daylight driving lights will be switched on.

-

Ground (GND) connections to transmission must be OK.

-

Selector lever must be in -P- position.

-

Ignition switched off.

Check solenoid valves:

-

Vehicles with 01 M transmission.

-

Vehicles with 09A transmission.

Work sequence (vehicles with 01 M transmission)

-

Disconnect 12-pin harness connector at transmission.

Observe safety precautions.

-

Check harness connector for contact corrosion and ingress of water.

If harness connector is not OK:

-

Repair malfunction.

-

Erase DTC memory of Transmission Control Module (TCM). Diagnostic mode 4: Reset/erase diagnostic data. See: Powertrain
Management/Computers and Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/With Generic Scan Tool/Diagnostic
Mode 4: Reset/Erase Diagnostic Data

-

Generate readiness code. See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive Cycles and
Readiness Codes

If harness connector is OK:

-

Check resistance of solenoid valves.

Checking resistance of solenoid valves

-

Re-connect 12-pin connector.

-

Connect test box to control module wiring harness. connect test box for wiring test. See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Reading and Clearing Diagnostic Trouble Codes/Scan Tool Connecting/Test Box, Connecting For Wiring Test

-

Measure resistance of solenoid valves at test box between sockets:

NOTE:  Resistance value is valid at approx. 20 degrees C. At higher temperatures, resistance value increases.

Diagram Information and Instructions|Page 5567 > < Diagram Information and Instructions|Page 5565