New Beetle L4-2.0L (AZG) (2003)
Installing
Installation is carried out in the reverse sequence, when doing this observe the following:
-
Moisten new O-ring -2- with engine coolant.
-
Install connecting flange -3- with thermostat -1- into engine block.
Note: The brace on the thermostat must be almost vertical.
-
Tighten mounting bolt-4-.
^
Tightening torque: 15 Nm (11 ft. lbs.)
-
Fill with engine coolant.