New Beetle L5-2.5L (BPS) (2006)
‹› Maintain a distance of at least 5 mm to ATF cooler when routing selector lever cable.
-
Install exhaust system and tunnel bridge.
-
Connect battery Ground (GND) cable.
-
Check shift mechanism => [ Selector Mechanism, Checking ] See: Shifter A/T/Testing and Inspection.
-
Install air filter housing.
-
Code radio.
-
Initialize power windows, set clock.