New Beetle Convertible L5-2.5L (BPR) (2007)
Chain Assembly Overview.
6
Timing Chain
‹› Beginning with Model Year (MY) 2008 the roller chain has been changed to a tooth chain.
‹› Removing:
-
Work procedure same as for "Adjust valve timing". Refer to => [ Valve Timing, Adjusting ] See: Cylinder Head Assembly/Adjustments.
-
Remove the vacuum pump. Refer to => [ Brake Booster Vacuum Pump ] See: Brakes and Traction Control/Power Brake Assist/Vacuum
Pump/Service and Repair/Brake Booster Vacuum Pump.
-
Mark direction of travel.
‹› Note when installing:
-
Install in original direction of rotation.
-
Chain must lie correctly in the tensioning and guide rails.
-
Adjust the valve timing. Refer to => [ Valve Timing, Adjusting ] See: Cylinder Head Assembly/Adjustments.
7
Strainer
‹› Replace
8
Bolt, 10 Nm
9
Timing Chain Tensioner
‹› Secure with locking pin (T03006).
10
Gasket
‹› Replace
11
Timing Chain Guide Rail
‹› Oil before installing the pin.
12
Bolt, 60 Nm + 90° (1/4) additional turn
‹› Replace
13
Bolt, 60 Nm + 90° (1/4) additional turn
‹› Replace