New Beetle Convertible L5-2.5L (BPR) (2007)
Valve Body: Service and Repair
Valve Body Assembly Overview
Valve Body Assembly Overview
1
ATF inspection plug, 27 Nm
‹› Always replace seal => [ (Item 2) Oil seal ]
‹› ATF level, checking and topping off => [ ATF Level ] See: Fluid - A/T/Testing and Inspection/ATF Level
2
Oil seal
‹› Always replace
3
Overflow tube, 2 Nm
‹› Remove to drain ATF
‹› ATF level, checking and topping off => [ ATF Level ] See: Fluid - A/T/Testing and Inspection/ATF Level
4
Oil pan
‹› Removing and installing => [ Oil Pan ] See: Fluid Pan/Service and Repair
5
Bolt, 7 Nm
‹› Tighten bolts for oil pan in several stages in diagonal sequence