New Beetle Convertible L5-2.5L (BPR) (2007)
‹› Note different length of bolts:
Bolt on brackets for wiring harness - 1 - and - 2 - with new bolts hand-tight.
Tighten remaining valve body bolts - arrows -, - arrows A - and - arrows B - hand-tight.
‹› If wires - 3 -, - 5 - and - 9 - are too short to connect to sensors or to screw on at points designated on the valve body, they have been routed
incorrectly or are jammed by the valve body. Valve body must be removed again and wires routed correctly.