Passat V6-2.8L (ATQ) (2004)
-
Use wiring diagram to check wires between test box and harness connector for open circuits or short circuits to Ground (GND) or B+.
fuel injector 1: Terminal 2 + socket 96
fuel injector 2: Terminal 2 + socket 112
fuel injector 3: Terminal 2 + socket 88
fuel injector 4: Terminal 2 + socket 97
fuel injector 5: Terminal 2 + socket 113
fuel injector 6: Terminal 2 + socket 89
Wire resistance: max. 1.5 Ohms
If there is no DTC in wire connection:
-
Replace Engine Control Module (ECM).
With Generic Scan Tool
Fuel Injectors, Checking
Recommended special tools and equipment
-
V.A.G 1526 multimeter or V.A.G 1715 multimeter
-
V.A.G 1527 voltage test lamp
-
V.A.G 1594 connector test kit
-
Wiring diagram
Test requirements
-
The respective fuses of Cylinder 1 Fuel Injector -N30- to Cylinder 4 Fuel Injector -N33-, Cylinder 5 Fuel Injector -N83-, Cylinder 6 Fuel Injector
-N84- must be OK
-
Fuel Pump (FP) Relay -J17- must be OK, check:
-
Battery voltage must be at least 11.5 volts.
-
All electrical consumers such as, lights and rear window defroster must be switched off.
-
Parking brake must be engaged or else daylight driving lights will be switched on.
-
For vehicles with automatic transmission, selector lever must be in position -P- or -N-
-
If vehicle is equipped with an A/C system, it must be switched off.
-
Ground (GND) connections between engine and chassis must be OK.
-
Engine speed (RPM) sensor must be OK, checking.