Passat GLS 4Motion V6-2.8L (ATQ) (2002)
-
Remove bolts - 1 -.
-
Remove tie-down - 2 -.
-
Remove clips - 4 -.
-
Unscrew plug - 5 - from threaded pin - 6 -.
-
Remove trim - 3 -.
Installing
Installation is performed in the reverse order of removal.
Assembly Overview
Assembly Overview