Passat GLS 4Motion V6-2.8L (ATQ) (2002)
-
Now put bonded rubber mounting and special tool into position.
Note: Use lubricant to press in the bonded rubber mounting e.g. lubricant G 294 421 A1
CAUTION: Make sure the bonded rubber mounting does not bend when pulling in otherwise the aluminum washer may be damaged!
-
Pull in the bonded rubber mounting until the chamfer-arrows- is positioned before the mounting hole.
-
Check that the chamfer of the outer ring is positioned evenly. Correct installation position again if necessary.
-
Slowly pull bonded rubber mounting completely in.
The tools and the bonded rubber mounting, must be guided by a second mechanic when pulling in.
Installing subframe