volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Recall - Install Vacuum By Pass Kit|Page 7305 > < Recall - Install Vacuum By Pass Kit|Page 7303
Page 10
background image

-

From the kit install angle hose -1-, check valve -2- and bypass hose -3- on the throttle valve control module, making sure that the marks -A-
and -B- on vacuum hoses are aligned as shown.

Important:  

The arrow -C-on the check valve must point in the direction of the throttle valve control module.

-

 From the kit, use 2 pinch clamps to secure angled hose -1- and a screw clamp to secure bypass hose -3-.

-

Correct position of hose assembly on throttle valve control module.

-

Clean the mounting surface of the intake manifold and make certain 0-ring gasket is in place before installing the throttle valve control module

-

Apply paste sealer from the kit on area -1- of the throttle valve heating tube

-

When the throttle valve control module is bolted on, ground wire -2- will be secured with the throttle valve heating tube bracket -3-.

Recall - Install Vacuum By Pass Kit|Page 7305 > < Recall - Install Vacuum By Pass Kit|Page 7303