volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Checking valve timing > < Dismantling and assembling engine
4-Cyl. injection engine (4 valve, roller rocker finger), Mechanics
Dismantling and assembling engine
Removing and installing ribbed belt

Removing

  • ‒ Remove engine cover first.
  • ‒ Mark ribbed belt direction of rotation.
 
V13-1286
  • ‒ → Using a spanner on the securing bolt swivel tensioning roller in direction of arrow.
  • ‒ Remove ribbed V-belt.

Installing

  • ‒ Place ribbed V-belt onto crankshaft pulley first. Slide belt onto tensioning roller last.
 
N13-0158

Ribbed belt routing

→ Belt drive with air conditioner compressor

  •      1 -     Pulley - P.A.S. vane pump
  •      2 -     Idler roller
  •      3 -     Pulley - Alternator
  •      4-      Air conditioner compressor
  •      5-      Crankshaft
  •      6 -     Tensioner
 
N13-0242

→ Belt drive without air conditioner compressor

  •      1 -     Vibration damper/belt pulley
  •      2 -     Tensioner
  •      3 -     Pulley - Alternator
  •      4 -     Ribbed belt
  •      5 -     Pulley - P.A.S. vane pump

Note:

When installing the ribbed V-belt, ensure the belt runs in the right direction and seats correctly on the belt pulleys.

The rest of the assembly is basically a reverse of the dismantling sequence.

Checking valve timing > < Dismantling and assembling engine