Installation happens in removal reversed order, minding the following: |
–
| Damp new sealing ring -3- with cooling fluid. |
–
| Install thermostat valve -4- on connection flange -2- and 1/4 turn (90 °) turn right. |
Note Thermostat valve arches must be nearly vertical. |
–
| Place connection flange -2- with thermostat valve -4- in the engine block. |
|
|
|