Install by inverting the removal sequence, paying attention to the following: |
WARNING In all works, especially in the engine compartment, pay attention to the following: |
t
| All pipes/hoses of any kind (such as fuel, hydraulic system, activated charcoal filter syste, cooling and refrigerant gas system, brake fluid, vacuum) and all electric harnesses must be installed so as to faithfully restore their original positions. |
t
| Make sure that there is enough free space from all the moving or hot parts. |
|
–
| Check clutch bearing for wear and replace it, if necessary. |
–
| Slightly lubricate the clutch roller bearing, the roller bearing guide sleeve and the primary shaft splines with Grease -G 000 100-. |
–
| If necessary, verify the clutch disc centralization Guide pin -T 10086-. |
–
| Check whether there are coupling guides for engine/transmission on the engine block and install them, if necessary. |
|
|
|