Dismantling and assembling drive shaft with triple roller joint AAR 2000/108 > < Dismantling and assembling drive shaft with VL107 constant velocity joint
Assembly overview - drive shaft with triple roller joint AAR 2000/108
   
Assembly overview - drive shaft with triple roller joint AAR 2000/108
1 - Twelve-point nut
q   Self-locking.
q   50 Nm and turn 45° further.
q   Always renew after removing.
q   Remove any corrosion on the thread of the outer joint before the nut is screwed on.
2 - Deflector ring
q   Ensure deflector ring is seated correctly before installing drive shaft → Anchor.
3 - Outer constant velocity joint
q   Renew only as complete unit
q   Removing → Anchor
q   Installing: drive onto shaft with plastic hammer until compressed circlip seats
q   Checking → Chapter.
4 - Retaining ring
q   Insert in groove in shaft
5 - Spacer ring
q   Installation position → Fig..
6 - Dished spring
q   Installation position → Fig..
7 - Clamp
q   Always renew after removing.
q   Various versions.
q   Allocation → Electronic parts catalogue “ETKA”.
q   Tensioning, variant 1 → Fig..
q   Tensioning, variant 2 → Fig..
8 - Boot for constant velocity joint
q   Check for splits and chafing.
q   Material: Hytrel (polyester elastomer).
q   Coat sealing surface of constant velocity joint with -D 454 300 A2- before installing.
9 - Clamp
q   Always renew after removing.
q   Tightening → Fig.
10 - Drive shaft
11 - Clamp
q   Always renew after removing.
q   Tightening → Fig.
12 - Boot for triple roller joint
q   Check for splits and chafing.
13 - Clamp
q   Always renew after removing.
q   Tightening → Anchor
14 - Multi-point socket head bolt
q   Initially tighten diagonally to 10 Nm
q   M 10 x 23; 70 Nm.
q   Always renew after removing.
15 - Joint body
q   Outside diameter: 108 mm.
16 - Triple roller star with rollers
The chamfer -arrow- points towards drive shaft splines.
17 - Retaining ring
q   Always renew after removing.
18 - Sealing ring
q   Always renew after removing.
19 - Cover
q   Always renew after removing.

   