Rabbit L5-2.5L (BGP) (2006)
Fluid - A/T: Service and Repair
ATF, Draining and Refilling
ATF, draining and refilling 09G, 6 Speed A/T
-
Turn off engine.
-
Remove sealing plug in oil pan - arrow - to check ATF.
-
Remove overflow tube - 1 - through check hole.
-
Drain ATF.
-
Install overflow tube.
-
Install sealing bolt hand tight.
-
Add 3 liters.
-
Start engine, shift through all selector lever positions, you must remain shifted in each position approx. 10 seconds.
-
Then check ATF level and top off.