Rabbit L5-2.5L (BGP) (2006)
-
Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).
-
Check the electrical harness connector for damage, corrosion, lose or broken terminals.
-
If necessary, repair the faulty wiring connection.
If no malfunction is found in the wiring and voltage supply was OK:
-
Replace Secondary Air Injection (AIR) Pump Motor -V101.
-
Install the center noise insulation fasteners - 1, 2, 3 - and the center noise insulation panel.
-
Connect the secondary air injection hose - arrow -.
Final procedures
After the repair work, the following work steps must be performed in the following sequence:
1. Check the DTC memory. See: Computers and Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic Mode 03:
Interrogating Fault Memory
2. If necessary, erase the DTC memory. See: Computers and Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/Diagnostic
Mode 04: Reset/Delete Diagnostic Data
3. If the DTC memory was erased, generate readiness code. See: Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive
Cycles and Readiness Codes
-
End of diagnosis