Rabbit L5-2.5L (BGP) (2006)
-
Ensure that wiring harnesses - 1 -, - 3 -, - 4 - and - 5 - are not jammed by valve body.
-
All bolts - arrows - for mounting valve body must be replaced.
-
Note different length of bolts:
-
Bolt on brackets for wiring harness - 1 - and - 2 - with new bolts hand-tight.
-
Tighten remaining bolts for valve body - arrows -, - arrows A - and - arrows B - hand tight.