Rabbit L5-2.5L (CBUA) (2008)
-
Remove cable mounting bracket from transmission -arrows-.
-
Tie shift cable and selector cable up.
-
Remove bracket -B- from transmission and pull it off from hose/line assembly -A-.
-
Remove transmission supports -arrows A-.
-
Place a lint-free rag under slave cylinder.
-
Pull clip for hose/line assembly out from slave cylinder to stop.
-
Pull hose/line assembly out of slave cylinder and plug it.
-
Remove slave cylinder bolts -arrows B- and slave cylinder.
Note: Do not depress clutch pedal.
Installing
Install in reverse order. Note the following:
-
Grease end of plunger with MoS 2 -grease.
-
Install slave cylinder and tighten bolts -arrows B- to torque specification.
-
Insert hose/line assembly into the slave cylinder up to the stop.
-
Press in the clip for hose/line assembly up to the stop.
-
Then install the transmission supports -arrows A-.