volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Intake Manifold|Page 2185 > < Intake Manifold|Page 2183
Page 1
background image

Intake Manifold: Service and Repair
Intake Connection Assembly Overview

Intake Connection Assembly Overview

‹› When engine is switched off, the intake connection is closed for approximately 3 seconds and then opens again. This reduces the stop jolt.

‹› The components illustrated correspond to cylinder bank 1. They are a mirror image of the components for cylinder bank 2.

1

Test connection bracket

‹› Cylinder bank 1 --> [ (Item 6) Test connection ] See: Diagrams/Mechanical Diagrams/Fuel Delivery and Air Induction/Fuel Return

Line/Engine Compartment Fuel Lines, Connection Diagram.

‹› Cylinder bank 2 --> [ (Item 1) Test connection ] See: Diagrams/Mechanical Diagrams/Fuel Delivery and Air Induction/Fuel Return

Line/Engine Compartment Fuel Lines, Connection Diagram.

2

8 Nm

3

Seal

‹› Replace.

‹› Before installing, check the sealing surfaces for contamination and clean if necessary.

4

Gasket

‹› Replace.

Intake Manifold|Page 2185 > < Intake Manifold|Page 2183