Up!
| Repairing steering box |

| 1 - | Right track rod ball joint |
| q | Marked with „A“. |
| q | Removing and installing → Chapter. |
| q | Checking → |
| q | Installation position → Anchor |
| 2 - | Nut |
| q | 50 Nm |
| 3 - | Clamp |
| 4 - | Bellows |
| q | Must not be twisted after adjusting toe. |
| q | Remove steering box to renew. |
| 5 - | Clamp |
| q | Renew. |
| q | Tightening → Anchor |
| 6 - | Seal |
| q | Allocation → Electronic parts catalogue „ETKA“ |
| 7 - | Right track rod |
| q | 80 Nm |
| q | Removing and installing → Chapter. |
| q | Replacement parts are supplied pre-adjusted. |
| q | Adjusting toe → Chapter. |
| 8 - | Steering box |
| q | Allocation → Electronic parts catalogue „ETKA“ |
| q | Removing and installing → Chapter. |
| 9 - | Left track rod |
| q | 80 Nm |
| q | Removing and installing → Chapter. |
| q | Replacement parts are supplied pre-adjusted. |
| q | Checking length and adjusting → Anchor. |
| 10 - | Left track rod ball joint |
| q | Marked with „B“. |
| q | Removing and installing → Chapter. |
| q | Checking → |
| q | Installation position → Anchor |
|
