Integra (RS, LS) L4-1834cc 1.8L DOHC PFI (1995)
DLC & SCS Connector Locations
Timing Mark Location
CAUTION: Do not short any of the pins on the 3 pin Data Link Connector together or to ground.
6. Install a shorting connector at the 2 pin Service Check Connector and set the timing with a timing light to 15° ± 2° BTDC @ 750 ± 50 rpm (red
line on crank pulley). Remove the shorting connector from the Service Check Connector.
7. After adjusting, torque the hold-down bolts, then install the cap on the bolt.
Torque: 18 Nm (13 ft lb)