audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Testing signal wire between engine control unit and ABS control unit > < Testing intake manifold flap changeover valve
Diesel Direct Injection and Glow Plug System (TDI 4 cyl.) >07.99
Checking auxiliary signals
Testing signal wire between engine control unit and gearbox control unit

The engine control unit and the gearbox control unit are connected to each other via a CAN (Controller Area Network) bus. The CAN bus consists of two signal wires which are used to transmit information (e.g. engine speed and accelerator pedal position).

  • ‒ Connect test box V.A.G 1598/22 to wiring harness for engine control unit =>Page 23-39.

Check the following wiring connections for open circuit and short circuit to positive or negative.

Test box V.A.G 1598/22, socket

Automatic gearbox control unit, contact

68

=> Current Flow Diagrams, Electrical Fault-finding and Fitting Locations

75

=> Current Flow Diagrams, Electrical Fault-finding and Fitting Locations

  • ‒ Rectify any open/short circuit as necessary.

Testing signal wire between engine control unit and ABS control unit > < Testing intake manifold flap changeover valve